Design and Build

Projects

Job Name:

Job Location:

Type of Project:

Engineer:

This project required the removal of the existing boilers to be replaced with (2) 4.3 million BTU Dietrich Boilers. The primary and secondary pumps also had to be replaced and the existing BAS upgraded.

Sir William Osler

Toronto

Plan and Spec

ENSO Systems

7220 West Credit Ave.

Mississauga ON L5N 5N1

Canada

TEL. (416) 231-1414

EMAIL. info@beringmechanical.com